The inspeXtor™ Project Installer along with the inspeXtor™ Value Added Reseller shall produce a Pull Schedule, which the inspeXtor™ Project Installer will be responsible for completing in the field. The Pull Schedule shall have columns with the following headings types:

Location, Fixture Location PSE #, Port External Node Driver, External Node Driver or Fixture Serial #, NODE/Battery Located Near Fixture Denotation,
Mini Splitter A Fixture Denotation, Fixture Type, Fixture Description, Fixture Wattage, Sensor, Controlled by Wall Switch #,

The Pull Schedule will resemble this image:

The completed Pull Image will resemble this image:

Completed Pull Image

Feedback

Was this helpful?

Yes No
You indicated this topic was not helpful to you ...
Could you please leave a comment telling us why? Thank you!
Thanks for your feedback.

Post your comment on this topic.

Post Comment